Switching Station Revsing
Cobalch ApS supplied 21 seals for Ø395 pipes Ø650 hole for pipe clutch station in Revsing for DONG.
The 21 penetrations were specifically produced for, when the pipes are located eccentric in the holes, they are produced from surveying and mounted as a split version, since the plant was installed.
Client: DONG A / S
Contractor: L & H – Rørbyg A/S